
The design aims to conserve as much of the existing buildings fabric as possible, however through the insertion of carefully designed contemporary interventions, reconfigure the spaces within for their new uses. A new secondary entrance and full height glazing has been introduced to the southern elevation with an internal double height void providing vertical connection between the two floors and allowing natural daylight to illuminate the multi-use hall on the ground floor and managed work spaces at first floor.



